Install the marble background wall according to the following process steps 1. Treatment of the base layer First of all, the base layer of the background wall needs to be processed for marking and positioning. The treatment method is not much different from that of paving and sticking the wall surface construction. It is enough to ensure that the wall surface is clean, free of floating soil and floating dust, and it has been leveled and coated with a moisture-proof layer. Then draw lines on the wall according to the construction drawings, and draw the overall horizontal and vertical control lines.
2. Install and fix steel keels For heavy marble slabs, steel keels should be used to reduce the impact of stone slabs on the wall and improve the overall earthquake resistance. The construction method is to drill holes on the wall and bury the fixing parts according to the construction drawings, and connect the keel to the fixing parts. The keel is required to be installed firmly and be flat with the wall.
3. Install the pendant on the keel After the steel keel is fixed, the pendant connected to the marble slab needs to be installed on the keel. The shape of the pendant is like the shape of the letter T. Connect the T pendant to the keel, and the upper and lower ends can hang two marbles; where there is only one marble at the bottom end, use a 45° pendant in the shape of 7. Just hang marble. Fourth, install the marble slab Connect the connectors, and then install the marble slab.
The specific method is to cut the upper and lower corners of each stone, inject marble glue into the mouth, and then insert the upper and lower cards of the connecting piece into the cut to fix. Five, caulking treatment After the marble slabs are installed, the gaps between the slabs are bonded. First clean up the dust and impurities in the cracks, and stick adhesive tape on the edge of the board to prevent the glue from polluting the marble surface. After gluing, the glue joints are required to be smooth and straight.
So what do you need to pay attention to when installing a marble background wall? The editor has sorted out the following 5 points for attention during installation, hoping to help you when installing the background wall. 1. To deal with the positioning of the base line, it is necessary to process the base layer of the background wall. The treatment method is not much different from that of paving and sticking the wall surface construction. It is enough to ensure that the wall surface is clean, free of floating soil and floating dust, and it has been leveled and coated with a moisture-proof layer.
Then draw lines on the wall according to the construction drawings, and draw the overall horizontal and vertical control lines. 2. Install and fix steel keels For heavy marble slabs, steel keels are required to reduce the impact of stone slabs on the wall and improve the overall earthquake resistance. The construction method is to drill holes on the wall and bury the fixing parts according to the construction drawings, and connect the keel to the fixing parts.
The keel is required to be installed firmly and be flat with the wall. 3. Install the pendant on the keel After the steel keel is fixed, the pendant connected to the marble slab needs to be installed on the keel. The shape of the pendant is like the shape of the letter T. Connect the T pendant to the keel, and the top and bottom can hang two pieces of marble; where there is only one marble at the bottom end, use a 45° pendant in the shape of 7. Just hang marble.
4. Install the marble slab and connect the connectors, and then install the marble slab. The specific method is to cut the upper and lower corners of each stone, inject marble glue into the mouth, and then insert the upper and lower cards of the connecting piece into the cut to fix. 5. Caulk treatment After the marble slab is installed, the gap between the slabs should be bonded.
First clean up the dust and impurities in the cracks, and stick adhesive tape on the edge of the board to prevent the glue from polluting the marble surface. After gluing, the glue joints are required to be smooth and straight.