Marble has many advantages, such as high hardness, high density, good texture, durability, and convenient maintenance and warranty. Using marble to pave the floor will look luxurious and high-grade, especially in public decoration. Stone is more widely used; The stone base should be treated before laying. The ground base for paving stone must be a rigid ground of cement mortar or concrete. Before paving, the ground dirt should be cleaned first.
The smooth ground should be chiseled, or the cement mortar with 20% 107 glue should be shaken on the ground to form a napped adhesive layer. The paving stones should be pre-patched, aligned, and numbered. The back of the sheet should be clean and free from dirt.
After cleaning, it should be immersed in water. After it gets wet, shade it. Apply protector to the back and sides.
Decoration renderings of marble floor tiles Before laying, the control line should pop out of the ground. When strumming, find the center point based on the length and width of the room. Pop up two vertical positioning lines with the center point as the core, and then pop up the positioning lines to both sides according to the stone specifications.
Lay two standard boards on the diagonal of the positioning line as the control model of the elevation. The seam when the thread is stretched should be controlled at about 1mm, and the elevation should be controlled according to the thread when laying. Stone slab paving should be made of dry hard mortar, and there are already prepared ones on the market.
It can also be prepared at the current humidity by holding it into balls and landing. Mortar should be mixed according to the volume ratio of cement: sand=1:3. When paving, first brush a layer of cement slurry on the ground, and then pave it with dry hard mortar. The width should be 20 mm larger than the stone material, and the thickness should be 40 mm higher than the elevation.
The mortar is leveled with an iron trowel. Lay the stone after aligning the vertical and horizontal lines, and gently hit the surface of the stone from the center to the four sides with a rubber hammer or wooden hammer to vibrate the mortar. After laying stones, the level should be corrected immediately with a level.
When there are any gaps or unevenness, the stone should be lifted and the mortar leveled again. The bottom should not be filled with mortar until the stone surface matches the elevation line. After the stone surface is aligned with the elevation line, the stone is lifted, and 5 mm of cement slurry is poured on the mortar surface, and then the stone is officially laid, and it is hard pressed with a leather hammer to be flush with the level.
The paving should be laid one by one, and then laid sequentially on both sides or along the line. After the stone paving is completed, it should be watered for 2 to 3 days. The maintenance method generally adopts the method of watering and curing, so that the surface of the stone is in a wet state, and the board is firmly bonded to the ground.
After maintenance, the ground should be polished as a whole, and then grouted with dilute cement mortar. After filling, the surface grout should be cleaned in time to prevent pollution of the stone surface layer. Finally, the floor is cleaned and polished.